Journals
Publish with us
Publishing partnerships
About us
Blog
Mathematical Problems in Engineering
Journal overview
For authors
For reviewers
For editors
Table of Contents
Special Issues
Mathematical Problems in Engineering
/
2018
/
Article
/
Tab 2
/
Research Article
Using the Bezier Curve and Particle Swarm Optimization in Trajectory Planning for Overhead Cranes to Suppress the Payloads’ Residual Swing
Table 2
A comparison of the maximum swing angles and average angles.
trajectory
PSO-BC
OTGM
PPBM
PSO-BC
OTGM
PPBM
Maximum swing angle (rad)
0.0494
0.0882
0.0872
0.0136
0.0363
0.0872
Average angle (rad)
0.0249
0.0247
0.0194
0.0047
0.0089
0.0193