Research Article
Optimal Model for Complementary Operation of a Photovoltaic-Wind-Pumped Storage System
Table 3
Results of comparison of the four schemes.
| Scheme | Power benefit (¥) | Output fluctuation (MW) | Variation of load and output difference (MW2) | The maximum peak-valley difference (MW) |
| | 87,800 | 158.6 | 77.33 | 8.0 | | 125,600 | 236.2 | 93.48 | 7.5 | | 121,440 | 11.25 | — | 4.0 | | 123,200 | — | 16.65 | 4.6 |
|
|