Research Article
Optimization of Inner Dumping Uncovered Height with Partially Covered End Wall in Adjacent Surface Coal Mining Districts
Table 1
Relevant parameters in between open pits and mining districts.
| Symbols | ① Between South Pit and North Pit | ② Transition from cross mining to mining along strike in number 3 mining district in NOPM |
| | 25° | 25° | | 20° | 20° | | 258 m~350 m, 300 m on average | 131 m~211 m, 155 m on average | | 160 m | 100 m | | 13.23 | 19.03 | | 10.35 | 4.9 | | 1250 (PHP building in the middle part) | 1150 | | 1.91 | 1.91 | | 4.1422 | 4.5811 | | 1.5% | 1.5% | | 17 | 17 | | −1.0938 million m3 | −0.4351 million m3 |
|
|