Research Article

Evolution Mechanism of Meandering River Downstream Gigantic Hydraulic Project I: Hydrodynamic Models and Verification

Table 5

Water level at drought period.

Section
location
Jianli CR @ Jun, 2006Qigongling CR @ Feb, 2012Tiaoguan CR @ Feb, 2014
=5231 m3/s =6262 m3/s =6518 m3/s
(m)(m)(m)(m)(m)(m)(m)(m)(m)

1#L23.1123.170.0629.0229.00-0.0224.4024.41-0.01
2#L22.9422.960.0228.8828.86-0.0224.1924.20-0.01
3#L22.5722.52-0.0528.7028.67-0.0324.0624.08-0.02
4#L22.2222.250.0428.5028.510.0123.9923.980.01
5#L22.1422.14028.3528.400.0523.8423.830.01
6#L23.1123.170.0628.1528.160.0123.6823.71-0.03
7#L//////23.5123.56-0.05