|
Index set |
|
| Facility indicator | | Facility location indicator |
| Layout stage |
|
Parameter variable |
|
| The total number of facilities | | The total number of layout stages |
| The length of the facility | | The width of the facility |
| The height of the facility | | The minimum lateral distance between facility and facility |
| The minimum longitudinal distance between facility and facility | | The minimum distance between facility and the wall in the -axis direction |
| The minimum distance between facility and the wall in the -axis direction | | The coordinate of the center of facility in the -th stage of layout |
| The coordinate of the center of facility in the -th stage of layout | | The lateral length of Manufacturing unit |
| The longitudinal length of Manufacturing unit | | The equivalent flow between the facilities and in the -th stage of layout |
| The handling frequency between the facilities and in the -th stage of layout | | The logistics costs per material per distance between the facilities and at any stage of layout |
| The material handling distance between facility and facility in the -th stage of layout; that is, |
| The facility movement costs in the stage of the layout to the next stage | | The facility setup costs in the stage of the layout to the next stage |
| The time required to move facility in the stage of the layout to the next stage | | Production unit profitability available per unit of time |
| Material handling costs | | Unit reconstruction costs |
| Production loss costs | | Weights for Material handling costs |
| Weights for Unit reconstruction costs | | Weights for Production loss costs |
| Manufacturing unit layout refactor total budget |
|
Decision variables |
|
|
|
|