Research Article
Evaluation Model of Generation Dispatching Optimization considering Participation of Electricity Retailers
Table 4
Comparison of coal consumption cost before and after the response.
| | ā | Before the response | After the response | Descent value | Descent rate |
| | Operating coal consumption (ton) | 44,272.36 | 33,255.66 | 11,016.7 | 0.249 | | Operating cost/ (thousands of dollars) | 2,566.51 | 1,927.86 | 638.65 | 0.249 | | Start-stop capacity/ MW | 6,570.80 | 4,530.00 | 2,040.80 | 0.311 | | Start-stop cost/ (thousands of dollars) | 3.81 | 2.63 | 1.18 | 0.311 | | Total cost/ (thousands of dollars) | 2,570.32 | 1,930.49 | 639.83 | 0.249 |
|
|