Research Article
Optimization Analysis of the Position of Thermometers Buried in Concrete Pouring Block Embedded with Cooling Pipes
Figure 6
Temperature surfaces and isotherms for intermediate sections for four different water-pipe spacing cases at t = day 2.
(a) Pipe spacing 1.0 m × 1.0 m
(b) Pipe spacing 1.5 m × 1.5 m
(c) Pipe spacing 1.0 m × 1.5 m
(d) Pipe spacing 2.0 m × 1.5 m