Research Article

Path Correction of the Boom Road-Header in Coal Mining Based on State Estimation

Figure 8

The simulation about path correction using the planned trajectory 2 and revised parameters. (a) Planned path and tracking. (b) Angular speed of the driving wheels. (c) Position and orientation errors.
(a)
(b)
(c)