Application of AHP and EIE in Reliability Analysis of Complex Production Lines Systems

Figure 2

KPI data coming from beer filling production lines. (i) Beer consumption (C1); (ii) unit energy consumption (C2); (iii) unit time production capacity (C3); (iv) unit time raw material consumption (C4); (v) total asset utilization rate (C5); (vi) linear gross yield rate (C6); (vii) total equipment utilization rate (C7); (viii) line efficiency (C8).
(a) Production data of line 1 in June 2016
(b) Production data of line 1 in November 2016
(c) Production data of line 3 in June 2016
(d) Production data of line 3 in November 2016