Research Article
Application of AHP and EIE in Reliability Analysis of Complex Production Lines Systems
Figure 2
KPI data coming from beer filling production lines. (i) Beer consumption (C1); (ii) unit energy consumption (C2); (iii) unit time production capacity (C3); (iv) unit time raw material consumption (C4); (v) total asset utilization rate (C5); (vi) linear gross yield rate (C6); (vii) total equipment utilization rate (C7); (viii) line efficiency (C8).
| (a) Production data of line 1 in June 2016 |
| (b) Production data of line 1 in November 2016 |
| (c) Production data of line 3 in June 2016 |
| (d) Production data of line 3 in November 2016 |