Research Article
Incorporating Variability in Lean Manufacturing: A Fuzzy Value Stream Mapping Approach
Table 3
Descriptive statistics of cycle time and WIP.
| | Range | Mean ± Std. deviation (i.e., μ ± σ) | K-S test |
| Raw material inventory (days) | (1.2, 2.7) | 2.01 ± 0.31 | 0.061 | Cutting (s) | (16, 24) | 19.84 ± 1.89 | 0.064 | Buffer 1 (days) | (0.3, 1.4) | 0.80 ± 0.23 | 0.252 | Prefitting (s) | (27, 34) | 30.05 ± 1.60 | 0.090 | Buffer 2 (days) | (1.1, 2.0) | 1.49 ± 0.15 | 0.063 | Computer stitching (s) | (303, 334) | 320.60 ± 6.25 | 0.721 | Buffer 3 (days) | (0, 0.8) | 0.43 ± 0.17 | 0.055 | Manual stitching (s) | (271, 327) | 298.06 ± 11.24 | 0.977 | Buffer 4 (days) | (0.5, 4.4) | 1.91 ± 0.84 | 0.590 | Assembly (s) | (485, 547) | 510.58 ± 12.61 | 0.773 | Buffer 5 (days) | (0.5, 4.5) | 2.18 ± 0.83 | 0.705 |
|
|