Research Article

Incorporating Variability in Lean Manufacturing: A Fuzzy Value Stream Mapping Approach

Table 3

Descriptive statistics of cycle time and WIP.

RangeMean ± Std. deviation (i.e., μ±σ)K-S test

Raw material inventory (days)(1.2, 2.7)2.01 ± 0.310.061
Cutting (s)(16, 24)19.84 ± 1.890.064
Buffer 1 (days)(0.3, 1.4)0.80 ± 0.230.252
Prefitting (s)(27, 34)30.05 ± 1.600.090
Buffer 2 (days)(1.1, 2.0)1.49 ± 0.150.063
Computer stitching (s)(303, 334)320.60 ± 6.250.721
Buffer 3 (days)(0, 0.8)0.43 ± 0.170.055
Manual stitching (s)(271, 327)298.06 ± 11.240.977
Buffer 4 (days)(0.5, 4.4)1.91 ± 0.840.590
Assembly (s)(485, 547)510.58 ± 12.610.773
Buffer 5 (days)(0.5, 4.5)2.18 ± 0.830.705