Research Article

Incorporating Variability in Lean Manufacturing: A Fuzzy Value Stream Mapping Approach

Table 6

Cycle time and WIP for future-state value stream map (1).

 Estimated valueTFNNFN
abc

Raw material inventory (hours)048(āˆ’0.44, 4.00, 8.44)(4.00, 1.33)
Cutting (s)162026(15.56, 20.00, 26.67)(19.84, 1.89)
Buffer 1 (hours)234(1.88, 3.00, 4.11)(3.00, 0.33)
Prefitting (s)253035(24.44, 30.00, 35.56)(30.05, 1.60)
Buffer 2 (hours)234(1.88, 3.00, 4.11)(3.00, 0.33)
Computer stitching (s)300320340(297.78, 320.00, 342.22)(320.60, 6.25)
Manual stitching (s)270300340(266.67, 300.00, 344.44)(298.06, 11.24)
Assembly (s)480510560(476.67, 510.00, 565.56)(510.58, 12.61)
Buffer 5 (hours)048(-0.44, 4.00, 8.44)(4.00, 1.33)

Note: the NTNs of cutting, prefitting, computer stitching, manual stitching, and assembly do not change with the current state.