Research Article
A Birandom Chance-Constrained Linear Programming Model for CCHP System Operation Management: A Case Study of Hotel in Shanghai, China
Table 1
Part of CCHP system parameters.
| | Parameters | Value |
| | Major economic parameters | | Maintenance cost of gas turbine | 0.03 RMB/kWh | | Maintenance cost of absorption chiller | 0.0002 RMB/MJ | | Maintenance cost of auxiliary boiler | 0.0006 RMB/MJ | | Maintenance cost of electricity chiller | 0.0005 RMB/MJ | | Electricity price in peak period | 1.104 RMB/kWh | | Electricity price in flat period | 0.653 RMB/kWh | | Electricity price in valley period | 0.333 RMB/kWh | | Natural gas prices | 2.32 RMB/m3 |
| | Major technical parameters | | Efficiency of exhaust heat exchanger | 0.776 | | Electrical efficiency of gas turbine | 0.8 | | Thermal efficiency of gas turbine | 0.18 | | Efficiency of auxiliary boiler | 0.85 | | Recovery waste heat efficiency of the absorption chillers | 0.695 | | Low calorific value of natural gas | 35.175 MJ/m3 | | Rated COP of absorption chiller | 1.2 | | Rated COP of electric chiller | 4.45 |
|
|