Research Article

A Birandom Chance-Constrained Linear Programming Model for CCHP System Operation Management: A Case Study of Hotel in Shanghai, China

Table 3

CCHP’s operation strategies under different α levers in typical day during winter, transition, and summer.

Itemα = 0.1α = 0.05α = 0.01
WinterTransitionSummerWinterTransitionSummerWinterTransitionSummer

Gas consumption (m3)16396.707756.3214299.1216406.027764.9514307.3716423.517781.1314321.83
Supplied cooling by AC (MJ)8425.9562954.16235598.588463.7863013.72235681.148534.6263125.49235836.02
Supplied cooling by EC (MJ)103.562012.9938833.40113.962029.7438865.52133.462061.1838925.79
Supplied heating by HE (MJ)257116.1766759.2511847.16257231.6566843.2211903.64257448.2867000.7212009.58
Supplied electricity by GT (kW)23070.1610913.1420118.8723083.2710925.2820130.4823107.8810948.0520226.90
Purchased electricity (kW)12942.4633006.1941686.7213004.8933074.2741762.3613122.0033201.9741929.58
System cost (RMB)1471820.001234922.001832058.001473759.001236843.001834206.001477396.001240445.001866149.00

Note. AC denotes absorption chillers; EC denotes electrical chillers; HE denotes heat exchanger; GT denotes gas turbine.