Research Article

A New Method for Predicting Ground Settlement Induced by Pipe Jacking Construction

Figure 4

Soil distribution (location of pipe jacking channel), concrete pipe joints, and cutterhead of pipe jacking machine. (a) Soil distribution. (b) Concrete pipe joint. (c) Cutterhead of pipe jacking machine.
(a)
(b)
(c)