Research Article
A New Method for Predicting Ground Settlement Induced by Pipe Jacking Construction
Figure 4
Soil distribution (location of pipe jacking channel), concrete pipe joints, and cutterhead of pipe jacking machine. (a) Soil distribution. (b) Concrete pipe joint. (c) Cutterhead of pipe jacking machine.
(a) |
(b) |
(c) |