Research Article
Geological Type Recognition by Machine Learning on In-Situ Data of EPB Tunnel Boring Machines
Table 2
Statistical properties of main parameters from the selected section of Tianjin Metro Line 9.
| ā | Advance rate (mm/min) | Cylinder thrust (kN) | Cutter head torque (kNm) | Cutter head rotational speed (r/min) |
| Max | 55.68 | 24701.68 | 1706.28 | 1.1 | Min | 16.84 | 10436.07 | 803.08 | 0.4 | Average | 31.53 | 15840.43 | 1264.49 | 0.94 | SD | 10.04 | 2905.33 | 148.71 | 0.14 |
|
|