Research Article
Geological Type Recognition by Machine Learning on In-Situ Data of EPB Tunnel Boring Machines
Table 5
Statistical properties of main parameters from the selected section of Tianjin Metro Line 3.
| ā | Advance rate | Cylinder thrust | Cutter head torque | Cutter head rotational speed | (mm/min) | (kN) | (kNm) | (r/min) |
| Max | 39.80 | 27447.14 | 1539.93 | 0.8 | Min | 18 | 15511.25 | 1030.53 | 0.5 | Average | 31.53 | 21198.53 | 1279.04 | 0.65 | SD | 0.53 | 3814.17 | 86.89 | 0.15 |
|
|