Research Article

Reactive Strategies in the Multiproject Scheduling with Multifactor Disruptions

Table 7

The results of tests.

NDGAGATB
CostTimeCostTimeCostTime

J10191.250.06182.730.02291.410.02
J201037.540.211027.960.062006.860.07
J302688.650.392700.440.144671.30.18
J405271.650.565329.70.339755.490.38
J6012763.83.9613124.60.7221874.41.25
J9032549.25.6732718.42.0949765.73.61