Research on Utility Evaluation of Grid Investment considering Risk Preference of Decision-Makers
Table 2
Project operation parameter setting.
| | Add point | Add load | Line length | New transformer capacity | Annual investment cost | Annual operating cost |
| — | — | MW | km | MV·A | Ten thousand | Ten thousand | Project A | Bus 1–bus 5 | 220 | 36 | 200 | 6520 | 520 | Project B | Bus 2–bus 6 | 180 | 75 | 150 | 7215 | 560 | Project C | Bus 6–bus 10 | 136 | 25 | 80 | 3443 | 500 | Project D | Bus 4–bus 9 | 210 | 44 | 60 | 4040 | 590 | Project E | Bus 7-bus 8 | 100 | 26 | 100 | 3820 | 500 | Project F | Bus 4–bus 2 | 150 | 50 | 80 | 4120 | 550 |
|
|