Research on Mathematical Model of Cost Budget in the Early Stage of Assembly Construction Project Based on Improved Neural Network Algorithm
Table 3
Items of material budget in early stage of prefabricated construction project.
| No. | Items of material budget | Unit |
| 1 | Prefabricated PC wall components | Cubic meter | 2 | Prefabricated PC floor (laminated) components | Cubic meter | 3 | Prefabricated PC stair components | Cubic meter | 4 | Prefabricated PC balcony components | Cubic meter | 5 | Prefabricated PC air conditioning panel components | Cubic meter | 6 | Prefabricated PC beam components | Cubic meter | 7 | Rebar B300HR(D < 25) | Ton | 8 | Screw-thread steel B225HR(D < 12) | Ton | 9 | Concrete C30 (premixed) | Cubic meter | 10 | Concrete C35 (premixed) | Cubic meter | 11 | Fine stone concrete C20 (premixed) | Cubic meter | 12 | Aerated light sand autoclaved block concrete | Cubic meter | 13 | Specialized component grouting | Ton | 14 | Remaining self-purchased materials (estimated value) | — |
|
|
The items of labor cost budget in early stage of prefabricated construction project are shown in Table 4 [ 18]. |