Research on Mathematical Model of Cost Budget in the Early Stage of Assembly Construction Project Based on Improved Neural Network Algorithm

Table 3

Items of material budget in early stage of prefabricated construction project.

No.Items of material budgetUnit

1Prefabricated PC wall componentsCubic meter
2Prefabricated PC floor (laminated) componentsCubic meter
3Prefabricated PC stair componentsCubic meter
4Prefabricated PC balcony componentsCubic meter
5Prefabricated PC air conditioning panel componentsCubic meter
6Prefabricated PC beam componentsCubic meter
7Rebar B300HR(D < 25)Ton
8Screw-thread steel B225HR(D < 12)Ton
9Concrete C30 (premixed)Cubic meter
10Concrete C35 (premixed)Cubic meter
11Fine stone concrete C20 (premixed)Cubic meter
12Aerated light sand autoclaved block concreteCubic meter
13Specialized component groutingTon
14Remaining self-purchased materials (estimated value)

The items of labor cost budget in early stage of prefabricated construction project are shown in Table 4 [18].