Research on Mathematical Model of Cost Budget in the Early Stage of Assembly Construction Project Based on Improved Neural Network Algorithm

Table 4

Items of labor cost budget in early stage of prefabricated construction project.

No.Items of labor costUnit

1Manual cleaning of foundation pitCubic meter
2Manual lashing of cast-in-place and steel bar makingTon
3Manual assembly and wooden template makingCubic meter
4Manual maintenance of cast-in-place and concrete pouringCubic meter
5Manual installation of prefabricated PC componentsCubic meter
6Tower crane driver, surveyor, and bell manCubic meter
7Manual masonryCubic meter
8Manual water resistanceCubic meter
9Manual fitmentCubic meter

The items of machinery budget in early stage of prefabricated construction project are shown in Table 5.