Research on Mathematical Model of Cost Budget in the Early Stage of Assembly Construction Project Based on Improved Neural Network Algorithm
Table 4
Items of labor cost budget in early stage of prefabricated construction project.
| No. | Items of labor cost | Unit |
| 1 | Manual cleaning of foundation pit | Cubic meter | 2 | Manual lashing of cast-in-place and steel bar making | Ton | 3 | Manual assembly and wooden template making | Cubic meter | 4 | Manual maintenance of cast-in-place and concrete pouring | Cubic meter | 5 | Manual installation of prefabricated PC components | Cubic meter | 6 | Tower crane driver, surveyor, and bell man | Cubic meter | 7 | Manual masonry | Cubic meter | 8 | Manual water resistance | Cubic meter | 9 | Manual fitment | Cubic meter |
|
|
The items of machinery budget in early stage of prefabricated construction project are shown in Table 5. |