Research Article

Multiobjective Optimization of Safety Risk of Prefabricated Building Construction considering Risk Correlation

Figure 3

Noninferior solution sets under different constraints: (a) cost constraint: 25; (b) cost constraint: 30; (c) cost constraint: 35; (d) cost constraint: 40.
(a)
(b)
(c)
(d)