Research Article
Multiobjective Optimization of Safety Risk of Prefabricated Building Construction considering Risk Correlation
Figure 3
Noninferior solution sets under different constraints: (a) cost constraint: 25; (b) cost constraint: 30; (c) cost constraint: 35; (d) cost constraint: 40.
(a) |
(b) |
(c) |
(d) |