Multiobjective Optimization of Safety Risk of Prefabricated Building Construction considering Risk Correlation

Table 3

Optimal control effects under different constraints before and after considering risk correlations.

Constraint right-hand parameter0.25 million yuan0.3 million yuan0.35 million yuan0.4 million yuan
IndexWithout considering correlationConsidering correlationWithout considering correlationConsidering correlationWithout considering correlationConsidering correlationWithout considering correlationConsidering correlation

11111111
11111111
00000000
01111111
11111111
11111111
11111111
00000000
00001111
01111111
00000011
00000000
00001110
11111111
10111111
10001111
00000001
00110000
11111111
11111111
10111111
11111111
11111111
Global optimal risk loss (10,000 yuan)69.6367.7146.3747.8429.8529.8619.3117.25
Global optimal control cost (10,000 yuan)23.6824.3529.8729.8734.9934.9939.2139.86