Research Article
A CEGA-Based Optimization Approach for Integrated Designing of a Unidirectional Guide-Path Network and Scheduling of AGVs
Table 4
Technological route information of job set 1.
| Job | Mixing ratio (%) | Processing station Mm and processing time (s) | Oi,1 | Oi,2 | Oi,3 | Oi,4 | Oi,5 |
| J1 | 25 | M1(150) | M3(70) | M7(100) | M5(50) | M9(0) | J2 | 25 | M4(100) | M8(50) | M6(75) | M2(150) | M9(0) | J3 | 25 | M2(150) | M5(75) | M8(125) | M1(60) | M9(0) | J4 | 25 | M3(150) | M6(150) | M4(50) | M7(50) | M9(0) |
|
|