Research Article
Simulation Method of Borehole Trajectory Based on Vector Similarity
Table 2
The designed borehole trajectory information of NP12-X16L.
| Measured depth (m) | Inclination (°) | Azimuth (°) | True vertical depth (m) | Build (°/30 m) | Turn (°/30 m) | Remarks |
| 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | Well head | 576.61 | 0.00 | 0.00 | 576.61 | 0.00 | 0.00 | Kick-off point | 1574.04 | 69.82 | 237.69 | 1344.87 | 2.10 | 0.00 | | 4186.83 | 69.82 | 237.69 | 2246.21 | 0.00 | 0.00 | Target A | 4853.55 | 69.82 | 237.69 | 2476.21 | 0.00 | 0.00 | Target B | 5114.00 | 69.82 | 237.69 | 2566.06 | 0.00 | 0.00 | |
|
|