Research Article
Probabilistic Analysis for Structures with Hybrid Uncertain Parameters
Table 7
Intervals of expectation and variance of 8 nodes of the hexahedral element at Point A.
| Node no. | Interval expectation | Interval variance | Computing time (s) |
| 7535 | [1.35818561, 1.40560837] | [0.05111004, 0.08449479] | 0.004 | 7536 | [1.37720014, 1.42532155] | [0.05238237, 0.08659866] | 0.004 | 7537 | [1.39622373, 1.44504495] | [0.05367141, 0.08873017] | 0.004 | 7538 | [1.41532345, 1.46484746] | [0.05498247, 0.09089812] | 0.004 | 7539 | [1.59172880, 1.64721704] | [0.06870772, 0.11359037] | 0.004 | 7540 | [1.59152348, 1.64702854] | [0.06874794, 0.11365677] | 0.004 | 7541 | [1.59078654, 1.64628807] | [0.06873925, 0.11364232] | 0.004 | 7542 | [1.59236121, 1.65139101] | [0.06875101, 0.11364232] | 0.004 |
|
|