Research on the Optimization Design of Abnormal Flip Buckets

Table 1

Hydraulic elements of the spillway tunnel Q = 71.96 m³/s ().

Number of measuring pointsMileageMeasured flow rate (m/s)Calculated flow rate (m/s)Notes

10 + 052.0008.958.95Round-to-square
20 + 062.0009.189.06
30 + 064.5009.186.77Maintenance
40 + 064.5009.186.77
50 + 068.0007.037.81Square-to-round
60 + 078.0008.958.97
70 + 105.0008.958.92Longtaitou
80 + 129.4478.958.94
90 + 410.2008.959.01
100 + 411.0008.999.16Pressure slope section
110 + 416.60011.5112.84
120 + 420.60031.8232.46After the gate
130 + 442.14828.8927.25Arc section
140 + 450.60027.7724.79