Research Article
Evaluating Construction Risks of Modified Shield Machine Applicable to Soft Soils Based on Fuzzy Comprehensive Evaluation Method
Table 3
Probability valuation of risk occurrence.
| |||||||||||||||||||||||||||
where 1.5, 2.5, 3.5, and 4.5 indicate that the probability of occurrence of the risk event is between the adjacent levels. |