The target layer | The first-level index layer | The second-level index layer |
|
The safety risk evaluation for modified shield machine construction applicable to soft soils (U) | The risk of shield launching and receiving (U1) | Deformation of the base (U11) |
Deviation from the axis during launching (U12) |
Soil influx into receiving shaft after dismantling portal (U13) |
Deviation from the axis during receiving (U14) |
Deformation of support during receiving (U15) |
The risk of shield tunneling (U2) | Inappropriate tunneling parameters (U21) |
Excessive rotation of the shield machine (U22) |
Blockage in earth conveying (U23) |
Deviation from the designed tunneling (U24) |
Leakage in the shield sealing system (U25) |
The risk of segment assembly (U3) | Segment dislocation (U31) |
Segment deviation (U32) |
Segment damage (U33) |
The risk of grouting (U4) | Not grouting in time (U41) |
Inadequate grouting (U42) |
Clogging of the grouting pipe (U43) |
Low quality of the grouting material (U44) |
The risk of working environment (U5) | Effect of groundwater (U51) |
The effect of tunnel underneath the river (U52) |
Tunneling through unfavorable geology (U53) |
|