Research Article

Evaluating Construction Risks of Modified Shield Machine Applicable to Soft Soils Based on Fuzzy Comprehensive Evaluation Method

Table 5

Products of the consequence valuation and the occurrence probability valuation of risks under U1.

Risk indexU11U12U13U14U15

C2.503.002.502.752.50
P1.502.752.002.501.50
C × P3.758.255.006.883.75