Research Article

Travel Time Reliability-Based Signal Timing Optimization for Urban Road Traffic Network Control

Table 11

Performance comparison for off-peak hour.

Timing planNTT (s)QL (m)DR (s)BTI

Original_Plan362.2249.5856.120.5269
TTR_Plan318.44 (−12.09%)36.93 (−25.51%)28.39 (−49.41%)0.3495 (−33.67%)
TT_Plan345.67 (−4.57%)39.93 (−19.46%)41.09 (−26.78%)0.4583 (−13.02%)