Research Article

Study on Floor Mechanical Failure Characteristics and Stress Evolution in Double Predriven Recovery Rooms

Figure 14

Distribution curves of vertical stress around the DPRR with different sizes of inter-DPRR pillar: (a) 15 m, (b) 20 m, (c) 25 m, and (d) 30 m as the longwall mining.
(a)
(b)
(c)
(d)