Research Article
A Risk Assessment Model for Dam Combining the Probabilistic and the Nonprobabilistic Methods
Table 3
Reliability iteration result statistics.
| Iteration times | | | |
| 1 | 24171.75 | 3.035949 | (23.301718, 0.261803, 0.561806, 0.997735) | 2 | 355.4752 | 3.071286 | (23.394813, 0.256261, 0.549460, 0.997648) | 3 | −3.8288 | 3.070785 | (23.397855, 0.256080, 0.549419, 0.997664) | 4 | −4.08E − 04 | 3.070785 | (23.397887, 0.256078, 0.549418, 0.997665) | 5 | −1.36E − 07 | 3.070785 | (23.397887, 0.256078, 0.549418, 0.997665) |
|
|