Journals
Publish with us
Publishing partnerships
About us
Blog
Mathematical Problems in Engineering
Journal overview
For authors
For reviewers
For editors
Table of Contents
Special Issues
Mathematical Problems in Engineering
/
2020
/
Article
/
Tab 5
/
Research Article
The Green Photovoltaic Industry Installed Capacity Forecast in China: Based on Grey Relation Analysis, Improved Signal Decomposition Method, and Artificial Bee Colony Algorithm
Table 5
The calculation results of the four models.
Forecasting model
RMSE
R
2
(100%)
MRE
LSSVM
5.15
95.09
87.54
ABC-LSSVM
5.26
97.49
90.76
EMD-ABC-LSSVM
1.95
99.51
41.46
CEEMD-ABC-LSSVM
0.63
99.84
28.82