Research Article

Modified PWM Direct Instantaneous Torque Control System for SRM

Table 1

Scheme of the modified PWM-DITC.

Status of sampling or errorSingle-phase conductionTwo-phase commutation
Conduction of torqueOutgoingIncoming

Terr ≥ Tm+Tsam = Tm+1 (hysteresis zone)
Terr ≤ Tm−Tsam = Tm−−1 (hysteresis zone)
Tm+ > Terr > Tm−Tm+ ≥ Tsam ≥ 0Natural sampling (PWM zone)
Terr < 00 (buffering zone)
0 ≥ Tsam ≥ Tm−Natural sampling (PWM zone)0
Terr > 00 (buffering zone)