Research Article
An Integrated Simulation and Virtual Cellular Manufacturing System Concept Approach for Maintenance Policy Selection
Table 1
Criteria and subcriteria of selecting PM policies.
| | Cost | | Value adding | | Safety | | Availability |
| C1: | Capital cost | C4: | Reliability | C7: | Operator skills | C10: | Facility utilization | C2: | Running cost | C5: | Capability | C8: | Flexibility | C11: | Resource availability | C3: | Maintenance downtime | C6: | Repair load | C9: | Efficiency | | |
|
|