Research Article
An Integrated Simulation and Virtual Cellular Manufacturing System Concept Approach for Maintenance Policy Selection
Table 3
Nugget production line machines simulation parameters.
| Machine | Process | Production line parameters | Failure time | Repair time | Repair cost | Process time | Production costs | Waste costs |
| M11 | Material preparation | TRIA (115,150,200) | EXPO (1.5) | 6500 | 50 | 10 | 10 | M12 | Material injection | TRIA (90,100,120) | EXPO (2.5) | 3000 | 25 | 3 | 3 | M13 | Spraying powder | TRIA (40,115,150) | EXPO (1.5) | 2000 | 30 | 5 | 5 | M14 | Cooking and freezing | TRIA (120,180,240) | EXPO (1.5) | 2800 | 50 | 3 | 3 | M15 | Packaging | TRIA (25,45,60) | EXPO (0.5) | 2000 | 45 | 7 | 7 |
|
|