Research Article
Study on Single-Machine Group Scheduling with Due-Window Assignment and Position-Dependent Weights
| Notations | Definitions |
| | Number of jobs | | Number of groups | | Index of job | | Index of group | | Number of group | | Job of group | | Setup time of group | | Processing time of job | | Due-window of job | | Due-window starting time of job | | Due-window finishing time of job | | Due-window size of job | | Completion time of job | | Starting (finishing) time of common due-window in group | | Common flow allowance of slack due-window in group | | An optimal schedule of jobs | | Lateness penalty of job | | Weight of the th position in group | | Unit cost of | | Unit cost of | CONDW | Common due-window assignment | SLKDW | Slack due-window assignment | DIFDW | Different due-window assignment | | Job scheduled in the th position | | Weight cost of th position in group | | Weight factor of group |
|
|