Research Article

A Design Method for the Roadside Clear Zone Based on Accident Simulation Analysis

Table 8

Results.

No.Mileage peg (km·h−1)R (m) (m)h (m)h/lLower limit value of m (m)Allowable RCZ width (m)Benefit-cost ratio (benefit/cost/10,000 yuan)Social stability riskSetting the RCZ

1K2 + 960∼K4 + 070105+∞31.650.1617.4810.973.18 (379/119)0.216Yes
2K4 + 070∼K5 + 18299+∞31.430.1666.5910.971.59 (196/123)0.216Yes
3K5 + 182∼K6 + 225883,90031.780.223No
4K6 + 225∼K7 + 330883,90032.230.280No
5K7 + 330∼K8 + 416833,50032.510.315No
6K8 + 416∼K9 + 550703,80031.630.1515.4110.971.13 (124/110)0.216Yes
7K9 + 550∼K10 + 615753,80031.340.1645.7910.970.66 (81/122)No
8K10 + 615∼K11 + 718691,80031.080.1365.5210.970.89 (87/97)No
9K11 + 718∼K12 + 800672,00031.890.237No
10K12 + 800∼K13 + 910732,00031.140.1435.5510.972.16 (224/103)0.216Yes
11K13 + 910∼K15 + 105692,00031.430.179No
12K16 + 105∼K16 + 358691,50031.050.1325.7810.972.00 (188/94)0.216Yes