Research Article

Research on the Scheduling of Tractors in the Major Epidemic to Ensure Spring Ploughing

Table 1

Scheduling schemes solved by 3 algorithms.

Scheduling algorithmTotal cost (yuan)Transfer cost (yuan)Waiting cost (yuan)Delay cost (yuan)

Empirical scheduling algorithm642,565.23291.419,317.12498
Scheduling algorithm based on GA623523.16310.54161.45593.17
Scheduling algorithm based on SA622743.97274.43011.54

The solution of the scheduling algorithm based on SA and GA is the mean of 20 operations.