Research Article
Optimization of Multiobjective Configuration of Multienergy Microgrid Based on HMM and Typical Scenarios: A Case Study of Smart Park
Table 3
The investment, operation, and maintenance parameters of the components.
| | Equipment | Parameter |
| | CHP | = 95000 yuan; = 3000 yuan/kW; = 0.16 yuan/kWh | | Heat pump | = 4000 yuan/kW; = 0.15 yuan/kWh | | Absorption refrigerator | = 4000 yuan/kW; = 0.15 yuan/kWh | | Gas-fired boiler | = 1500 yuan/kW; = 0.1 yuan/kWh | | Distributed PV | = 5000 yuan/kW; = 150 yuan/kW/year | | Distributed wind power | = 6000 yuan/kW; = 0.06 yuan/kWh | | Photothermal | = 250 yuan/m2; = 220 yuan/m2/year | | Heat storage equipment | = 450 yuan/kWh; = 0.09 yuan/kWh | | Electrical energy storage | = 2500 yuan/kWh; = 0.04 yuan/kWh | | Thermal pipeline | = 750 yuan/m |
|
|