Research on High-Speed Railway Freight Train Organization Method considering Different Transportation Product Demands

Table 7

The loading rate of the train plan and its remaining tonnage situation.

DirectionSectionBeijing–ShijiazhuangShijiazhuang–ZhengzhouZhengzhou–WuhanWuhan–ChangshaChangsha–Guangzhou

DownSection discharge (t)261259.98251.23229.22229.22
Section loading capacity (t)261261261261261
Section loading rate (%)10099.696.2587.8287.82
Line weighted loading rate (%)90.97
Remaining tonnageTrain 11.027.779.026.23
Train 522.7622.76
Train 62.79

UpSection discharge (t)231.81244.13207.67241.21258.19
Section loading capacity (t)261261261261261
Section loading rate (%)88.8193.5379.5692.4198.92
Line weighted loading rate (%)87.92
Remaining tonnageTrain 17.2024.1419.792.81
Train 229.194.1429.19
Train 55.53