Research Article
Comprehensive Risk Evaluation in the Long-Term Operation of Urban Subway Based on Multiple Indices
Figure 8
Monitored settlement of tunnels from Ding’an Road Station to Longxiang Bridge Station. (a) Left tunnel. (b) Right tunnel.
| (a) |
| (b) |