Research Article

Comprehensive Risk Evaluation in the Long-Term Operation of Urban Subway Based on Multiple Indices

Table 10

Risk level determined by different methods.

Evaluation methodsIndicesWeightCalculated valueThresholdRisk level

TRLMaximum ground settlement (mm)0.04363.1572Level 2: 2.4–3.7Moderate
Maximum rate of ground settlement (mm/d)0.1606
Geological conditions0.3549
Maximum settlement of tunnel (mm)0.3089
Lining leakage0.0618
Density of surface structures0.0468
Disturbance of tunnelling0.0234
Zhejiang provincial codeAccumulated ground settlement (mm)27.29Low risk: 300 mmLow
Tianjin provincial codeMaximum rate of ground settlement (mm/a)54High risk: > 50 mm/aHigh