Research Article
Comprehensive Risk Evaluation in the Long-Term Operation of Urban Subway Based on Multiple Indices
Table 2
Preliminary identification of factors.
| | Objective level | Criteria level | Index level (unit) |
| | Risk level | Regional surface settlement | Maximum ground settlement (mm) | | Average ground settlement (mm) | | Maximum rate of ground settlement (mm/d) | | Geological conditions | | Operation of subway | Maximum settlement of tunnel (mm) | | Average settlement of tunnel (mm) | | Lining leakage | | Cyclic vibration in operation of subway | | Disturbance of construction | Density of surface structures | | Disturbance caused by nearby constructions | | Disturbance of tunnelling | | Loading of surface structures |
|
|