Research Article
Comprehensive Risk Evaluation in the Long-Term Operation of Urban Subway Based on Multiple Indices
Table 3
Risk grading for each factor.
| Factor | Risk degree (score) | Low | Moderate | High | 1 | 3 | 5 |
| Maximum ground settlement (mm) | < 300 | 300–800 | > 800 | Maximum rate of ground settlement (mm/d) | < 0.08 | 0.08–0.14 | > 0.14 | Geological conditions | Hard formations | Soft formations | Mixed formations | Maximum settlement of tunnel (mm) | < 20 | 20–70 | > 70 | Lining leakage | No leakage | Partial leakage | Full leakage | Density of surface structures | Dense low-rise buildings | Dense moderate-rise buildings | Dense high-rise buildings | Disturbance of tunnelling (disturbed depth) (m) | < 0.8 | 0.8–1.5 | > 1.5 |
|
|