Research Article

Comprehensive Risk Evaluation in the Long-Term Operation of Urban Subway Based on Multiple Indices

Table 4

Selected factors for the multiple indices system.

Objective levelCriteria levelIndex level (unit)

Risk levelRegional surface settlementMaximum ground settlement (mm)
Maximum rate of ground settlement (mm/d)
Geological conditions
Operation of subwayMaximum settlement of tunnel (mm)
Lining leakage
Disturbance of constructionDensity of surface structures
Disturbance of tunnelling