Research Article
Comprehensive Risk Evaluation in the Long-Term Operation of Urban Subway Based on Multiple Indices
Table 9
Values of monitored factors involved in the evaluation.
| Objective | Criteria | Index (unit) | Values |
| Risk level | Regional surface settlement | Maximum ground settlement (mm) | 27.29 | Maximum rate of ground settlement (mm/d) | 0.15 | Geological conditions | Soft formations | Operation of subway | Maximum settlement of tunnel (mm) | 68.18 | Lining leakage | Completely impermeable | Disturbance of construction | Density of surface structures | Dense high-rise buildings | Disturbance of tunnelling | Disturbance depth < 0.8 m |
|
|