Research Article

Comprehensive Risk Evaluation in the Long-Term Operation of Urban Subway Based on Multiple Indices

Table 9

Values of monitored factors involved in the evaluation.

ObjectiveCriteriaIndex (unit)Values

Risk levelRegional surface settlementMaximum ground settlement (mm)27.29
Maximum rate of ground settlement (mm/d)0.15
Geological conditionsSoft formations
Operation of subwayMaximum settlement of tunnel (mm)68.18
Lining leakageCompletely impermeable
Disturbance of constructionDensity of surface structuresDense high-rise buildings
Disturbance of tunnellingDisturbance depth < 0.8 m