Research Article

Cooperative Scheduling of AGV and ASC in Automation Container Terminal Relay Operation Mode

Figure 3

Continuous operation flowchart of AGV in the dual-cycle operations: (a) mode 1; (b) mode 2; (c) mode 3; (d) mode 4.
(a)
(b)
(c)
(d)