Research Article
Cooperative Scheduling of AGV and ASC in Automation Container Terminal Relay Operation Mode
Table 4
Operation process of each kind of equipment under the two schemes with or without handshake area design.
| Schemes | Equipment | Work sequence |
| With handshake area design | AGV1 | 15-8-1-10-5 | AGV2 | 13-20-4-9-12 | AGV3 | 6-18-11-19-3-14 | ASC1 | 15-6-8-18-1-11-10-13-19-2-0-5-4-3-9-14-12 | ASC2 | 14-13-7-8-20-2-17-16-10-4-19-9-5-12-3-18 |
| Without handshake area design | AGV1 | 6-15-11-10-19 | AGV2 | 1-8-14-3-5 | AGV3 | 9-4-20-12-18-13 | ASC1 | 6-15-11-1-8-10-14-19-9-3-4-5-20-12-18-13 | ASC2 | 16-12-19-20-7-9-8-4-10-3-2-17-18-14-13-5 |
|
|