Research Article

Cooperative Scheduling of AGV and ASC in Automation Container Terminal Relay Operation Mode

Table 4

Operation process of each kind of equipment under the two schemes with or without handshake area design.

SchemesEquipmentWork sequence

With handshake area designAGV115-8-1-10-5
AGV213-20-4-9-12
AGV36-18-11-19-3-14
ASC115-6-8-18-1-11-10-13-19-2-0-5-4-3-9-14-12
ASC214-13-7-8-20-2-17-16-10-4-19-9-5-12-3-18

Without handshake area designAGV16-15-11-10-19
AGV21-8-14-3-5
AGV39-4-20-12-18-13
ASC16-15-11-1-8-10-14-19-9-3-4-5-20-12-18-13
ASC216-12-19-20-7-9-8-4-10-3-2-17-18-14-13-5