Research Article

Combined Configuration of Container Terminal Berth and Quay Crane considering Carbon Cost

Table 10

Sensitivity analysis table based on unit QC operation efficiency.

Efficiency of quay crane operation (Box/hour)Target function value (yuan)Terminal operation costs (yuan)Port time cost of the ship (yuan)Average port time (hour)

35220972.7234093.4190357.740.3
40220599.2234821.7187413.439.5
45218999.5233528.2185099.238.3
50217733.1232423.5183455.537.2
55216406.8231456.6181290.635.7
60215471.6230284.3180908.632.8
65213772.6229085.5178042.530.8
70211961.9228130.6174234.927.3
75209644.3226578.1170132.125.7
80206486.4224634.8164140.121.8